Using a measuring tape measure 35 inches 89 cm up from.
Roll roofing installation step by step.
Attach it to the valley with roofing nails spaced 6 inches apart about 3 4 inch from the edge.
How to do it attach first course.
Cut the rolled roofing.
3 take a roll of 18 inch wide roofing and use it to cover the length of the valley.
Apply roofing cement to the roof.
2 like any other roof project you should start this one by addressing the valleys.
Prepare a valley between joined roofs by cutting a strip that is 18 inches wide and covers the entire length of the.
To seal a plumbing vent spread roofing.
Install drip edge and install 9 cant strips of roll roofing material along the rake and eaves edges gable ends and lower roof edge such that the roofing strip overhangs the roof deck by 1 4 to 3 8.
Step by step roll roofing installation 1.
Install a drip edge around the perimeter of the roof.
Mark a chalk line to identify the end of your first layer.
If the plumbing vent is close to the peak of the roof lap the shingles over the peak of the roof.
Step 1 draw the base line for you to have a basis on where to proceed with the installation of roof rolls create a line to serve as a mark.
Cut the shingles to fit around the flange s dome.
Spread the roofing cement along the.
This aluminum flashing protects the edges of the roof sheathing.
Installing the rolled roofing 1.
10 easy steps for diy rolled roofing installation 1 spend some time cleaning the roof before beginning a rolled roofing installation project.
This should give you a 1 inch overhang on the eaves including the top edge of.
Use a trowel to scoop up the roofing cement.
Place the top edge of the roofing along the chalk line.
Along the eave measure 35 1 2 inches and run the chalk line along this point.
Adhere the shingles adjacent to the flange with roofing tar.
Roll out and cut roll roofing to cover the length of the roof.
Nail the roofing strips parallel to the roof edge set in 1 and 8 from the roof edge with nails spaced 4 o c.
Adhere the joint where the cut edges of the shingles meet the dome with roofing tar.
Prepare roof edges cant strips.