Once free slide the drip edge out and discard.
Roof drip edge installation after shingles.
Install roof drip edge along the eaves add underlayment then place drip.
How to fix a roof drip edge installing roof drip edge flashing properly.
Windy september 22 2017 4 11pm 10.
It is designed to protect the roof s sheathing from water damage caused by rain snow or ice being blown or rolling back beneath the edge of the shingles.
Be sure to tuck the drip edge under the starter strip and felt paper.
Drip edging is a strip of flashing that is applied to the edge of roofing prior to the installation of other items.
Gently lift up the shingles on the edge of the roof and locate the nails holding the existing drip edge onto.
How to install drip edge flashing on a roof step 1.
Measure the length of the eave you need to cover with drip edge using a tape measure.
Secure the drip edge with roofing cement.
4 deep nail the drip edge to the sheathing every 16 if installing multiple runs of drip edge lap them by 1 4 1 2 inch keeping the nail back from the lapped joint.
Push the drip edge a bit so that it passes under the shingle and appears from its other side.
Make sure the corner is tight and that the bottom edge is tight to the fascia before nailing off the drip edge.
The starter course is comprised.
Now that the roof is applied it is much more difficult invasive time consuming to install the drip edge being 3 stories only makes it much worse.
Select enough lengths of.
Once all the underlayment is applied go back and place.
Slide the corner tight to the fascia.
Using drip edge with a nailing edge approx.
Place the metal roof drip edge flashing along the gable ends.
Using a utility knife cut back the front end of the drip edge.
Apply a continuous bead of cement along the top of the drip edge then press down on the shingle.
Place a nail at one end then the other.
It can be done.
Make sure the outer edge extends over the gutter.
Save yourself some.
Use a flat pry bar and hammer to pry the nails out of the drip edge gently.
Slowly lift a shingle that is closest to the apex of the roof.
Slip the wide flat flange of the material all the way under the first course of roof shingles as illustrated.
The way your sheeting is on top of the sub facia requires a drip edge to cover it so that the edge of the sheeting doesn t wick moisture into it.
Install the drip edge by fitting it on the roof eave pushing it tightly against the edge of the plywood and.
How to install a drip edge.
If it doesn t pull the drip edge out slightly from under the shingles.
Gently slide the flatter side of the drip edge under the eave.
Install the starter course.