Some panels have pre drilled holes.
Roof sheet installation.
Measure from the peak of the roof along each rafter on one side of the roof to determine the exact length of each.
Properly fasten panels including fastening and spacing hints step 4.
Laying the first sheet of roofing.
Take care the first piece is aligned precisely perpendicular square to the edge.
Align cap sheet 1 4 from the edge at the lowest point of the roof.
Position the first piece of plywood.
Cover sheathing with.
Space the screws about 12 in 30 cm apart down the entire piece of metal.
Allow for a minimum of 18.
For best weatherproofing begin installing your sheeting on the side opposite the.
Prime the face on the roof and allow to dry before installing cap sheet.
Make absolutely sure the first sheet laid is properly positioned.
This video shows how some roofs fail under heavy winds in uplift situations.
Liberty sbs self adhering roofing system will provide long lasting protection for the low slope areas of your property without the danger or hassles associated with the installation of other conventional roofing products.
If yours do not then you will need to drill holes.
Cut the panels to the desired length.
Pre drill holes on the ridges.
Be sure the larger edge is laid so that the small edge of the next panel will overlap it.
Position your next sheets.
Keep these tips in mind when roofing in hurricane areas.
Align the first metal roofing panel so that it overlaps the edging by 1 2 to 3 4 of an inch and is square to the roof.
Installing corrugated roofing 1.
The connection between the roof sheathing and the structure is a vulnerable point that is known to fail during a hurricane.
Check the nailing surface is level step 2.
Take your first sheet of metal and place it on the roof so that it overhangs the edge at least 3 4 in 1 9 cm.
Step 3 installing liberty self adhered cap sheet.
During a hurricane the strength of the sheathing on the roof can greatly impact the homes ability to weather the storm.
You will need to order enough metal material to cover the entire roof and this process.
And scroll down to see more details on each with installation hints and tips below.
Most panels come up to 32 feet 9 8 m in length.
Ventilate the roof according to current building codes step 3.
Where do i begin.
Measure the roof area.
Install the roofing screws vertically along each rib in the panel.
Roofing installation guide orient sheets before lifting.
Learn about the liberty sbs self adhering base ply sheet.
Install edge flashing over the base sheet in a 1 8 bed of cement and stagger nail with two rows of roofing nails 3 o c.
Cut each rafter tail on the chalk line with a circular saw to ensure that every rafter is the same length.
You ll want to order metal panels that are an appropriate color and look to complement your.
Use your neoprene washer head screws to secure the metal to the sheathing.