There was no way that the gutter installe was going to get the upper edge of the gutter behind the drip edge.
Roofing gutter drip edge installation.
Tools supplies tin sn.
Slide the corner tight to the fascia.
The roof leg should extend a minimum of 2 back onto the roof sheathing.
Place a nail at one end then the other.
Ask this old house general contractor tom silva demonstrates the importance of a properly installed drip edge subscribe to this old house.
To install a drip edge on a newly constructed roof or on a re roofing job attach the drip edge along the roof s eaves first.
You may need to nail through the starter strip into the drip edge.
Installing drip edge on your roof.
Some rain runoff by capillary action runs up under the shingle drip edge and down the fascia behind the gutter installing drip edge on a new roof or re roofing job.
This is important to protect damage to your fascia soffits rafters.
Make sure the outer edge extends over the gutter.
It is best to install a drip edge on a day with warm weather because it makes it easier for the shingles to be stripped back.
Gently lift up the shingles on the edge of the roof and locate the nails holding the existing drip edge onto.
How to install a drip edge.
However keep in mind that tile shingles or materials like slate cannot be lifted so always install a gutter apron for new roofing.
It can be done.
The roofer installed the drip edge tight against the fascia.
With without rain gutters.
Secure the drip edge with roofing cement.
Once free slide the drip edge out and discard.
You can use nails to tightly secure it.
Make sure to support the long end of the cut if you let it fall after cutting it will bend down and kink the drip edge.
If it doesn t pull the drip edge out slightly from under the shingles.
Be sure to tuck the drip edge under the starter strip and felt paper.
While the vertical leg should be placed 1 4 1 2 away from the fascia.
Raise the shingles and push the top rim of your drip edge beneath them.
Make sure the corner is tight and that the bottom edge is tight to the fascia before nailing off the drip edge.
Ideally it is recommended to nail about every 12 inches.
How to install drip edge flashing to a new roof.
For drip edge installation align it for directing water flow into gutter alongside the roof edges.
Begin at the lower corner of the roof and gradually progress to the top.